Notes

ProductPlanningClaude

From a sales pitch to a product plan

A pitch to a first customer made dozens of promises. Here’s how I turned them into a platform map, phased delivery docs and mockups, all as Claude artifacts anyone could open.

Applies to
Engineering leads turning a sales pitch or customer commitments into a delivery plan.
Verified with
A SaaS platform plan I wrote as a set of Claude artifacts in November 2026.

A sales pitch to a first customer had made dozens of commitments, and engineering needed a plan for all of them. I started from the pitch itself, promise by promise, and built every step as a Claude artifact, so anyone could open the same link and see the same thing.

  1. The pitchevery promise made to the customer
  2. Commitmentscounted, and tagged by what each needs
  3. Platform maplayers, each box live, in build or proposed
  4. Phaseswhat ships first, and why
  5. Delivery docs and mockupsone per phase and per big component
From promises to a plan. Each step is a page someone can open, comment on and push back on.

Tag every promise by what it needs

Each commitment in the pitch got tagged with what it would actually need: data we didn't have yet, an outside integration, a new screen, a new engine.

The tags did most of the planning. When a large share of the promises all depended on the same missing piece, like live vehicle data, that piece clearly had to come first, whatever else was on the wishlist. Counting the tags answered "where do we start?" without much debate.

Draw the whole platform, then colour it

Next came one page with the whole platform on it, drawn as layers that data flows through:

  1. Outside datacard networks, price files, telematics, the customer's own systems, weather and road closures
  2. Intakethe processors and pollers that bring each source in
  3. Storeswhere facts live, and for how long
  4. Intelligence layerready-made numbers, and links between trucks, drivers and places
  5. Enginesrouting, anomaly checks, recommendations
  6. Experiencesthe driver app, the fleet portal, an AI assistant, exports
The six layers, from outside data to the people who use it.

Every box got a colour: green for live today, blue for designed or in build, orange for proposed in this plan. Clicking a box showed what it does, what feeds it and who uses it. That colouring was the most useful thing on the page: anyone could see at a glance how much of the promise already existed and how much was new.

Walk one real event through it

A map can look complete and still have gaps, so the page also traced one ordinary event, a single fuel purchase, through every layer: where it arrives, what it's joined with, which engine looks at it, and what each person sees afterwards. Anything the event couldn't reach was a missing link.

Show it before building it

Boxes on a map don't get much reaction from people, so the plan included mockups of what each role would see, built from made-up data and clearly labelled as ideas rather than designs, plus a tab per role showing what that role gets from the platform. Separate design artifacts went deeper on individual screens.

The page ended with the principles the plan follows and the questions still open, and it said "draft for discussion" at the top, so people knew it was there to be argued with.

Phase it, then write it down

The roadmap split the work into phases, with the proposed ones highlighted. Then each phase, and each big component, got its own delivery doc, so nobody had to hold the whole plan in their head. A separate data sheet estimated the costs.

Why artifacts worked for this

CallerArtifactWhat it was for
CommitmentsCounted in the plan pageevery promise, tagged by what it needs
Platform mapAn interactive pagethe whole system, filterable by live, in build or proposed
Delivery plansDocsone per phase and per component, for comments and review
ScreensDesign mockupswhat each role would see
CostsA data sheetan estimate everyone could check
Each kind of planning work got the artifact type that fits it.

Each one was a single link to share, it updated in place when the plan changed, and people could comment right on it. Writing the plan as pages also forced me to make it readable by people who weren't in the room when it was made.